MIL-STD-1901A
4 |
GENERAL REQUIREMENTS |
8 |
4.1 |
Ignition Systems |
8 |
4.1.1 |
Ignition system design |
8 |
4.1.2 |
Ignition safety device |
8 |
4.2 |
Analyses |
8 |
4.3 |
Ignition System |
9 |
4.3.1 |
Ignition safety device |
9 |
4.4 |
Manual Arming |
9 |
4.5 |
Safety System Failure Rate |
10 |
4.6 |
Documentation |
10 |
4.7 |
Electromagnetic Environments |
10 |
4.8 |
Electronic Logic Functions |
10 |
4.9 |
Fail-Safe Features |
10 |
4.10 |
Explosive Ordnance Disposal |
10 |
4.10.1 |
EOD reviewing authority |
10 |
4.11 |
Armed or Non-armed Condition |
11 |
4.11.1 |
Non-armed condition assurance |
11 |
4.11.2 |
Visual indication |
12 |
4.11.3 |
Electrical firing energy dissipation |
12 |
4.12 |
Design for Quality Control, Inspection and Maintenance |
12 |
4.13 |
Design Approval |
13 |
4.14 |
Reviewing Activity |
13 |
5 |
DETAINED REQUIREMENTS |
14 |
5.1 |
Application Guidance |
14 |
5.2 |
Pyrotechnic Trains and Firing Energy Trains |
14 |
5.2.1 |
Pyrotechnic or explosive sensitivity (transfer charge and igniter pyrotechnics) |
14 |
5.2.2 |
Pyrotechnic train interruption |
15 |
5.2.3 |
Non-interrupted pyrotechnic train control |
16 |
5.2.4 |
Initiator electrical sensitivity |
16 |
6 |
NOTES |
18 |
6.1 |
Intended Use |
18 |
6.2 |
Acquisition Documents |
18 |
6.3 |
Additional Criteria |
18 |
6.4 |
Custodian |
18 |
6.5 |
Hazard Analyses |
18 |
6.6 |
Subject Term (Key Word) Listing |
18 |
6.7 |
International Standardization Agreements |
19 |
6.8 |
Changes from previous issue |
19 |
iii
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business