MIL-STD-1901A
4.13 Design Approval. At the inception of system development and demonstration, the developing activity should obtain approval from the cognizant safety authority with both the design concept, and the methodology for assuring compliance
with safety requirements. At the completion of engineering development, the developing activity shall present a safety assessment to the cognizant safety authority (see 4.14) for review to obtain approval of the design.
4.14 Reviewing Activity. New or altered designs or new applications of approved designs shall be presented to the appropriate service safety review board for a safety evaluation and certification of compliance with the standard:
a. Army:
Chairman
US Army Ignition System Safety Review Board
ATTN: AMSAM-SF Redstone Arsenal, AL 35898
b. Navy and Marine Corps:
Chairman, Weapon System Explosives
Safety Review Board
Commander, Naval Ordnance Safety and Security Activity
Farragut hall, Building D323
23 Strauss Ave.
Indian Head, MD 20540-5555
c. Air Force:
USAF Nonnuclear Munitions Safety Board
ATTN: AAC/SES
1001 N. Second St., Suite 366
Eglin Air Force Base, FL 32542-6838
13
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business